Donna Wastewater Treatment Plant

Location: 1.25 River Road, Donna, TX Type of Work: WWTP Improvements Work Done For: The City of Donna Contract Amount: $5,932,213.23 Description: Pesado replaced all equipment and bridges in the aeration basins along with installing new 30’ roaters. Pesado built new 100’ by 12’ headwalls with new equipment including but not limited to rotating screen…

Learn More

Borgfeld West Enchanted Pump

Contract Amount: $2,920,697 Type of Work: Rock Trenching, 12″&16″ Water main in county ROW, 24″ Steel Casing (open cut), 30″ road bore, 12″ directional bore, installation of a new pump station, new 50,000 gal water tank, metal building, concrete foundations, asphalt paving, electrical.

Learn More

Babcock Road Phase V

Contract Amount: $1,799,065 Type of Work: Install sewer, water adjustments for the SAWS and Bexar County. Includes 36″&42″ CSC water main, 60″ Steel Casing (Open cut), 8″&15″ sewer main to 20’ deep, by-pass pumping, rock trenching, installed in a heavy traffic / split construction method.

Learn More

Singing Hills

The project consists of a new Wastewater treatment plant, Lift station, and utility work for a major development in Bulverde, TX. WWTP consist of a 212,000 gal storage tank, package plant, structural concrete, pump station, electrical/instrumentation, and plant piping. Lift station includes the 96” diameter wet well, pumps and piping. The utility package includes 10…

Learn More

Alamo Guenther

Alamo Guenther Includes installation of a 24” Fused PVC & PVC sewer system in an existing busy downtown street with depth’s to 48’. 2ea Siphon Structures, 60”/24” road boring under the San Antonio River, sewer by-pass pumping and traffic control are required to complete this complicated project. Project total $3.9 million. Winner of the 2015…

Learn More

Leon Creek

Headwork’s modifications, new bar screen, gate replacements, diversion structures 40’ to 50’ depth. Built 78” aerial steel pipe crossing 300 length. Placed 8,300 ft. of 60” FRP sewer at depths of 24’ to 50’ vertical feet. Project total $8 million.

Learn More

NBU Water Line Adjustment

For some time TXDOT has planned the design for the widening of Walnut from Landa street to loop 337. This was needed to accommodate New Braunfels growing population and ease traffic congestion. The geographic location of the road follows a canyon along the transition from blackland prairie to Edwards’s plateau. This unique geology included some…

Learn More